Project Description

Country: USA and Mexico

Location: Tecate

Total Budget: $21,000

Areas of Focus: Disease prevention and treatment, Water and sanitation, Maternal and child health

Activity Type: Water: Sanitation

Summary: Identifying homes and installation of septic tanks, running water, hand washing facilities and toilets to facilitate improved sanitation and reduce risk of disease while improving child health and basic hygiene understanding.


Sanitation and Water, Community and Child Health:

Corazon estimates that more than 51% of Mexicans live in poverty with insufficient resources to provide basic living needs including housing, water supply and sanitation. Corazon therefore supports the building of communities by strengthening families, enabling service, promoting self-sufficiency and inspiring mutually beneficial relationships across borders. (Information copied from Corazon website, some editorial added).

Corazón provides a sense of community in which all families within it can help themselves while helping others. Corazon raises funds in collaboration with volunteers and constructs homes within a community for families. The family must be actively involved in the project. The homes are septic system ready, but these have not historically been part of the program until the pilot project in March 2015. few homes have access to piped water owing to the cost and connection fees.

The serious need for hygiene and welfare of families and the community is the provision of water and waste management (sanitation). This involves the retroactive placement of septic systems where a property is suitable for such installation. It also involves the provision of piped water to the property where this is feasible. As part of Rotary, this fulfills part of the objective of Rotary, namely to provide sanitation and clean water; as well as contribute to child health and improvement in basic hygiene, which means disease prevention. Running water, hand washing and septic tanks lead to a better quality of life for both the families and the community

The YLSRC now has experience with the installation of 5 septic systems, as retroactive fitting of suitable homes. We understand the cost issues and are constantly working to reduce these to a lower level. We expect the cost per tank and installation to be reduced from $1700 to $1500 for the coming Rotary year. YLSRC and the Long Beach Rotary club are teaming up to implement this project. The clubs anticipate upwards of 15 Rotarians being involved in the program (and plans collaboration with other Rotary clubs), from assisting installation of running water and septic systems, to working to raise additional funds for more systems. The funds we are currently requesting are for the installation of 12 to 13 septic systems to improve sanitation for 12-13 homes during the 2016-2017 Rotary year. Engineers without Borders are advising us, having conducted the scoping of the pilot project. This is a District Grant as ALL FUNDS ARE MANAGED and PAID IN THE USA, through Corazon, which is based in Santa Ana, CA.

Project Contact Person

District: 5320

Rotary Club of: Yorba Linda Sunrise

Primary Contact: Ian Hicks

Email: ianhicks@icloud.com

Project Status

Completed
This project is "Completed". This means the project has been implemented and the report was accepted by the district leadership. The project will stay listed on this website as a testimony of the achievements of the project partners.

Project listed for the 2016-17 Rotary Year.

Proposed Financing

Existing Contributions Towards This Project

Date

Cash

DDF

Total

Yorba Linda Sunrise (5320)

8-Jun-16

$500

$500

$1,000

Long Beach (5320)

14-Jun-16

$10,000

$10,000

$20,000

Total

$10,500

$10,500

$21,000

Project Supporting Documents


[13-Jun-17]
2017_06_12 tank purchase.pdf


[24-Jun-17]
Additional check from YLSRC to Corazon


[13-Jun-17]
Backhoe biodigester


[13-Jun-17]
Biodigester order


[24-Jun-17]
Checks written by YL Sunrise


[24-Jun-17]
Copies of checks from YLSRC


[24-Jun-17]
Corazon list supporting documentation


[12-May-17]
Customs


[24-Jun-17]
Final report


[13-Jun-17]
Final report R1


[13-Jun-17]
Materials biodigester


[12-May-17]
PO 026


[13-Jun-17]
PO 052


[13-Jun-17]
PO 084


[13-Jun-17]
PO 087


[13-Jun-17]
PO 088


[12-May-17]
PO 137


[12-May-17]
PO027


[12-May-17]
PO029


[12-May-17]
PO035


[12-May-17]
PO040


[13-Jun-17]
PO089


[13-Jun-17]
PO096


[12-May-17]
PO138


[12-May-17]
PO145


[12-May-17]
Progress report


[13-Jun-17]
Receipt 2


[13-Jun-17]
sand gravel biodigester


[13-Jun-17]
Septic tank expenses 6-5-17


[12-May-17]
Summary to date


[13-Jun-17]
Tank expenses income breakdown


[12-May-17]
Tank receipt


[13-Jun-17]
Tanks 001


[13-Jun-17]
Water & Backhoes


[14-Jun-16]
Water & Sanitation


[12-May-17]
Water receipts


[15-Jun-17]
YLS Summary and Receipts

 

Project Photos


There are no photos yet for this project.
Go to the administration page to upload photos.

History Log Entries

8-Jun-16

System Entry

Creation of project page.

14-Jun-16

System Entry

Project reverted to "Published".

14-Jun-16

System Entry

Project is now "Fully Pledged".

14-Jun-16

System Entry

Project reverted to "Published".

14-Jun-16

System Entry

Pledge of $10,000 with $10,000 DDF by Adriana Lanting of the Rotary Club of Long Beach, District 5320.

14-Jun-16

System Entry

Project is now "Fully Pledged".

14-Jun-16

System Entry

Project sent for club signatures.

14-Jun-16

System Entry

Project signed by Ian Hicks.

14-Jun-16

System Entry

Project signed by Adriana Lanting.

14-Jun-16

System Entry

Project signed by Jayne Lastusky.

14-Jun-16

System Entry

Project signed by Jan Horton.

16-Jul-16

by Tom Robinson

System Entry: Project approved by the District Approval Committee.

24-Aug-16

by Helen Maxwell

System Entry: Check for DDF payment issued by Foundation Treasurer.

12-May-17

by Ian Hicks

Progress report plus receipts and financials to date uploaded.

15-May-17

by Tom Robinson

System Entry: Project has been implemented and final report uploaded.

13-Jun-17

by Ian Hicks

Final report and receipts uploaded

24-Jun-17

by Ian Hicks

Revised final report and supporting documents uploaded.

27-Jul-17

by Tom Robinson

System Entry: Final report approved by the District Approval Committee.