P-1541

H2OpenDoor Water Project

Description

Financing

Documents

Photos

History Logs

Project Description

Country: USA

Location: Nicaragua

Total Budget: $30,000

Areas of Focus: Peace and conflict prevention/resolution, Disease prevention and treatment, Water and sanitation, Maternal and child health, Basic education and literacy, Economic and community development

Activity Type: Water: Supply/Access

Summary: Provide water filtration equipment for consumption of and sale of water to neighboring towns in Nicaragua.


Rural villages have contaminated water available. The project would provide a water filtration system producing pure, potable water with capacity in excess of the village needs. The village will be able to produce and sell potable water to their neighboring communities. The availability of water will reduce the rates of illness and death among children and adults. The project will provide a source of income for the village. 12-25 Rotaractors will be invited to travel to Nicaragua to help with the installation during the trip to take place July 24-30, 2017.

Project Contact Person

District: 5150

Rotary Club of: Peninsula Sunrise(Redwood City/Menlo Park),The

Primary Contact: Jon Kaufman

Email: jkaufman@klp.com

Project Status

Dropped
This project has been "Dropped". Check the history log entries to see why it was dropped.

Project listed for the 2017-18 Rotary Year.

Proposed Financing

Existing Contributions Towards This Project

Date

Cash

DDF

Total

Peninsula Sunrise(Redwood City/Menlo Park),The (5150)

21-Jan-17

$10,000

$1,500

$11,500

Remaining Amount to Raise

Additional Contribution (Needed) - Click here to add a contribution.

$18,500

Total

$10,000

$1,500

$30,000

Project Supporting Documents


There are no documents yet for this project.
Go to the administration page to upload documents.

Project Photos


There are no photos yet for this project.
Go to the administration page to upload photos.

History Log Entries

21-Jan-17

System Entry

System Entry: Creation of project page.

2-Sep-18

System Entry

System Entry: Project dropped per lack of response to the carry-over notification emails.

© 2010 Philippe Lamoise - Website design by Philippe Lamoise, D2G Online