Project Description

Country: Kenya

Location: Machakos

Total Budget: $4,000

Area of Focus: Basic education and literacy

Activity Type: Education: General

Summary: Masaku (Machakos) school for the Physically Disabled and Mentally challenged, Kenya. Dining Room repairs and Workshop light improvement project.


Need: Dining Room is in dire need of repairs. Student workshop and class rooms are very dark.

Proposed solution:

1. Renovate the Dining room (floor, stage, windows, door, paint, etc.)

2. Replace one or two roofing iron sheets in each dark classroom and workshop with see-through or translucent roofing material to increase natural light and reduce need to run costly day lights.

Desired outcome:

1. New roofing panels would tremendously increase classroom natural lighting and reduce additional student injury.

2. Positively impact and inspire the learning experience of 157 physically disabled students.

3. Reduce the electric bills for the school by eliminating the need to run costly lights during the daytime hours.

4. Improve equal access to education. Impact academic performance which will make the students more inspired and productive members of society thus build self-esteem and self-worth.

Sustainability:

There will be no need for repairs in the next 10 to 15 years. Increased savings from reduced high electricity bill will be used in other delayed facility maintenance.

Project Cost: $5900

Additional funding ($1500) from other sources and will have some donated materials.

RC El Cajon Sunset commitment to project is $4000.

This corroborative project and inspirational fellowship will involve Rotarians from El Cajon Sunset, RC Syokimau and RC Machakos, Kenya.

Project Contact Person

District: 5340

Rotary Club of: El Cajon Sunset

Primary Contact: Richard Makau

Email: erafiki2003@aol.com

Project Status

Completed
This project is "Completed". This means the project has been implemented and the report was accepted by the district leadership. The project will stay listed on this website as a testimony of the achievements of the project partners.

Project listed for the 2018-19 Rotary Year.

Proposed Financing

Existing Contributions Towards This Project

Date

Cash

DDF

Total

El Cajon Sunset (5340)

29-Jul-18

$2,000

$2,000

$4,000

Total

$2,000

$2,000

$4,000

Project Supporting Documents

Project Photos

History Log Entries

29-Jul-18

System Entry

System Entry: Creation of project page.

1-Aug-18

by Mike Whitehurst

Grant needs to be signed by two club members.

Add names to history log of second signers, including

in box below, add names and email for distribution list.

Go to description page click "start signature process".

4-Aug-18

by Mike Whitehurst

District 5340 does not have a copy of the Club MOU for your Rotary Club.

Please go to the Documents tab, download the form, titled "Club MOU"and then upload the completed form.

4-Aug-18

by Mike Whitehurst

System Entry: Project sent for club signatures.

5-Aug-18

System Entry

System Entry: Project signed by Richard Makau.

6-Aug-18

by Richard Makau

Club MOU posted and the same emailed to the District via John Fistere.

7-Aug-18

by Mike Whitehurst

Resent signature request to djgunder@earthlink.net

7-Aug-18

by Dominic Gunder

System Entry: Project signed by Dominic Gunder.

8-Aug-18

by Mike Whitehurst

System Entry: Project approved by the District Approval Committee.

18-Aug-18

by Mike Whitehurst

Please go to the Documents tab and print/complete/upload the Bank Information form. WHEN UPLOADING PLEASE CHECK THE BOX FOR RESTRICTED ACCESS. If the information is the same for both grants, you only need to submit this form once.

26-Aug-18

by Mike Whitehurst

Please go to the Documents tab and print/complete/upload the Bank Information form. WHEN UPLOADING PLEASE CHECK THE BOX FOR RESTRICTED ACCESS.

31-Aug-18

by Richard Makau

District Grant P2450_P2456 DDF Bank Deposit Information uploaded.

19-Sep-18

by Scott Carr

System Entry: Check for DDF payment issued by Foundation Treasurer.

8-Apr-19

by Richard Makau

We experienced minor delay in project start. School lacked an alternate room for dining and some students were allergic to dust. Project implementation is currently underway during Kenya Easter school break (April month).

15-May-19

System Entry

System Entry: Final Report signed by Dominic Gunder.

16-May-19

System Entry

System Entry: Final Report signed by Richard Makau.

16-May-19

by Mike Whitehurst

System Entry: Final report approved by the District Approval Committee.