P-4896

ECTLC Gazebo

Description

Financing

Documents

Photos

History Logs

Project Description

Country: USA

Location: El Cajon

Total Budget: $2,000

Areas of Focus: Maternal and child health, Basic education and literacy

Activity Type: Health: Volunteer Services

Summary: Gazebo and Hard Top Steel Roof


We would like to supplement our Men's and Women's Singles Dormitories with

sheltered outdoor spaces that our program members can use for Bible studies,

homework preparation, small gatherings and fellowship.

A hard steel top gazebo would provide additional protection against inclement weather

and direct sunlight. We've determined that the structure that would best serve our

purposes at the best price would be the Backyard Discovery Arcadia 20 ft. x 9.5 ft.

All Cedar Wooden Gazebo with Hard Top Steel Slant Roof, which is currently

$2707.01 per unit on Amazon. We would use our Maintenance Department to erect

these structures.

Project Contact Person

District: 5340

Rotary Club of: El Cajon

Primary Contact: David W Johnston

Email: djbanker@cox.net

Project Status

Paid
This project is "Paid". This means that the funds from the district have been issued. This project is now being ready for implementation. When this is done, a report needs to be uploaded on the project page and the "Reported" button needs to be clicked, then the status of the project will be changed to "Reported".

Project listed for the 2023-24 Rotary Year.

Proposed Financing

Existing Contributions Towards This Project

Date

Cash

DDF

Total

El Cajon (5340)

19-Jul-23

$1,000

$1,000

$2,000

Total

$1,000

$1,000

$2,000

Project Supporting Documents


[29-Jan-24]
2024 Auto deposit

 

Project Photos

History Log Entries

19-Jul-23

by David W Johnston

System Entry: Creation of project page.

30-Aug-23

by David W Johnston

System Entry: Project sent for club signatures.

30-Aug-23

by David W Johnston

System Entry: Project signed by David W Johnston.

2-Oct-23

by David W Johnston

We are hoping to fund this email soon. Please advise.

2-Oct-23

by Susan Ferarra

System Entry: Project signed by Susan Ferarra.

5-Oct-23

by Alan Turner

System Entry: Project approved by the District Approval Committee.

6-Mar-24

by Dave Brooks

System Entry: Check for DDF payment issued by Foundation Treasurer.

© 2010 Philippe Lamoise - Website design by Philippe Lamoise, D2G Online