|
SIMAMA CAMPUS INFRASTRUCTURE (SCI) ROTARY GLOBAL GRANT - SUMMARY
Project Overview
The Simama Campus Infrastructure Project in Nanyuki, Laikipia County aims to provide reliable and safe water infrastructure to support Simama's child protection, education, residential care and farming programmes.
The project builds on an existing borehole and solar pump and proposes:
A steel water tower with four 10,000-litre tanks - 40,000 litres total
Water distribution piping across the campus
Water filtration/purification systems
Farm water distribution and gravity-fed drip irrigation
Improved handwashing, sanitation and menstrual hygiene arrangements
Hygiene education and behaviour-change activities
Beneficiaries & Rotary Area of Focus
The main beneficiaries are vulnerable children supported by Simama, including children in residential care and those receiving education sponsorship, as well as staff and programme participants. The wider community could benefit indirectly through improved food production and potentially future access to surplus resources.
The Rotary Area of Focus is Water, Sanitation and Hygiene (WASH), particularly improving access to safe drinking water and sanitation.
Measuring Impact
Monitoring will look at access to improved drinking water and sanitation, people trained, water quality, functioning storage and distribution infrastructure, hygiene knowledge and practices, menstrual hygiene facilities, irrigated farm area and reductions in programme disruptions caused by inadequate water.
Monitoring will primarily be undertaken by Simama staff and the Rotary Club of Laikipia Highlanders, with appropriate technical/water authorities involved in water-quality monitoring.
Location & Timeline
The project will take place in Nanyuki, Laikipia County, Kenya, with the grant period currently indicated as 15 January 2027 - 15 December 2027.
Host & International Sponsor Roles
The Rotary Club of Laikipia Highlanders is the host sponsor. It will oversee implementation locally, coordinate stakeholders and site access, monitor implementation, manage grant documentation and finances, and act as the primary liaison with Simama.
The Rotary Club of Sonoma Valley is the international sponsor. It will support the grant application, coordinate with Rotary International and District 5130, lead international fundraising and provide international oversight.
Importantly, grant funds are intended to be received and managed by RC Laikipia Highlanders. The two clubs will formalize their respective responsibilities through a written project agreement.
Budget
The application currently shows a total project budget of KES 14,864,658 / USD 114,785, using an exchange rate of KES 129.35 = USD 1 set on 19 August 2026.
The budget consists of:
Water storage/distribution infrastructure - USD 34,000
Farm water and irrigation - USD 9,000
Water filtration system With Solar power - USD 45,295
Training & Branding - USD 8,830
Monitoring, Evaluation and project management - USD 8,830
Contingency - USD 8,830
Current Funding Position
At the point captured in this application, funding entered is:
USD 10,000 cash from Rotary Club of Sonoma Valley
USD 10,000 cash from District 5130
Need Identified
Although Simama already has a borehole and solar pump, it lacks sufficient water storage, distribution and treatment infrastructure.
The community representatives reported that they rely on rain water and that during dry periods, water has had to be transported from the river or purchased.
Existing challenges include basic bucket-and-tap handwashing arrangements, latrine sanitation and inadequate menstrual-hygiene disposal arrangements. These limitations affect drinking water, sanitation, kitchen hygiene, residential care, education and farming.
The needs assessment involved Simama staff, the Rotary host team, a teacher from Lairagwan Comprehensive School, the local chief, village elders, caregivers and children, together with a physical site visit.
Implementation
Implementation will move from technical verification and procurement into construction and installation of the water tower, tanks, distribution system, filtration systems and farm irrigation.
It will also improve sanitation and menstrual-hygiene arrangements, provide hygiene education, train responsible staff, commission the systems and establish ongoing monitoring for Rotary reporting.
The project complements Simama's existing child protection, education sponsorship, mentorship and sustainable farming programmes, rather than establishing a separate programme.
Sustainability
After the grant ends, Simama management and staff will operate and maintain the infrastructure. Staff will receive technical training, annual maintenance is intended to form part of Simama's operating budget, and qualified local technicians will be engaged when specialist maintenance is required.
The infrastructure will ultimately be owned and managed by the appropriate Simama entity, not by Rotary or individual Rotarians.
There are plans to support the community with clean drinking water.
Long-term sustainability will also be supported through continued Simama fundraising and the farm, which is intended to reduce food costs and strengthen campus sustainability. The possibility of selling surplus water was identified, but importantly, the application does not treat this as a committed income stream because technical, legal, water-resource and community considerations would first need to be resolved.
In Summary
This is a USD 114,785 WASH infrastructure project for Simama Campus designed to turn the existing borehole and solar-pump resource into a reliable, treated and distributed water system that supports vulnerable children, sanitation, education and sustainable farming, with RC Laikipia Highlanders as host sponsor and RC Sonoma Valley as international sponsor.
|