26-May-17 |
by Jim Epstein |
Sent welcome message
|
26-May-17 |
by Jim Epstein |
Rocks Springs Rotary is not qualified for 2017/18
|
26-May-17 |
by Jim Epstein |
Report due on previous project P-1181
|
26-May-17 |
by Jim Epstein |
Rock Springs Rotary must meet $50/capita donation to the annual fund in 2016/17 to be eligible in 2017/18
|
26-May-17 |
System Entry |
System Entry: Creation of project page.
|
28-May-17 |
by Jim Epstein |
Project needs to be signed
|
28-May-17 |
by Tim Savage |
System Entry: Project sent for club signatures.
|
28-May-17 |
by Tim Savage |
System Entry: Project signed by Tim Savage.
|
4-Jun-17 |
by Jim Epstein |
Rock Springs not eligible for grant funding until a report on project P-1181 is uploaded.
|
7-Jun-17 |
by Jim Epstein |
Approved if report on previous project turned in, club gets qualified and club meets $50/capita requirement
|
7-Jun-17 |
by Jim Epstein |
The requirements must be met by June 30
|
3-Jul-17 |
by Jim Epstein |
Previous project report accepted, club president completed online qualification and $50/capita requirement met
|
6-Jul-17 |
by Jim Epstein |
System Entry: Project approved by the District Approval Committee.
|
17-Jul-17 |
by Bill Kehl |
System Entry: Check for DDF payment issued by Foundation Treasurer.
|
11-Oct-17 |
by Randall Looper |
Please send a History Log update as to the status of your project.
|
11-Oct-17 |
by Randall Looper |
Please send a History Log update as to the status of your project.
|
4-Jan-18 |
by Randall Looper |
Please send a History Log update as to the status of your project.
|
12-Apr-18 |
by Randall Looper |
Please enter your quarterly update via history log.
|
21-Apr-18 |
by Tim Savage |
Soil has been prepared, sprinklers in place. Waiting for better weather to install sod!
|
21-Apr-18 |
by Randall Looper |
System Entry: Project has been implemented and final report uploaded.
|
3-Jul-18 |
by Randall Looper |
Has the sod been installed? Please enter an update with a history log.
|
6-Jul-18 |
by Tim Savage |
Sod has been purchased, waiting for cooler weather to lay it.
|
3-Sep-18 |
by Randall Looper |
System Entry: Final report approved by the District Approval Committee.
|