P-2500

Blue Mound Fitness Park

Description

Financing

Documents

Photos

History Logs

Project Description

Country: Montague

Location: Nocona, TX

Total Budget: $5,770

Area of Focus: Economic and community development

Activity Type: Health: General

Summary: Initial phase construction of access and parking lot for a physical fitness trail and exercise stations benefitting the people in Nocona, TX and those residents nearby.


THE PROJECT HAS BEEN PUT ON "HOLD" UNTIL the 2019-2010 FISCAL YEAR

The Blue Mound Fitness Park is intended as a City of Nocona owned and maintained park dedicated to providing residents and non-residents of all ages, an outdoor facility to maintain their general health and well being by use of a walking-biking-running trail together with Fitness Stations, a Gazebo shelter and benches for quiet reflection.

The Fitness Park will provide a fitness trail for the citizens of Nocona and surrounding area residents, with elevation changes for better cardio health and nature setting with views for mental well being.

Additionally, local groups such as the Relay for Life have expressed an interest in using the trail for future fund raising and health related events.

The Trail and Fitness Improvements Proposed; -TOTAL PROJECT

The Fitness trail is a non-motorized path, 6 ' wide and approximately 5280 feet long. winding around the site through the trees, climbing up and down the slopes. The Trail Entrance near the parking lot has an ADA compliant drinking fountain and shaded rest station. 6 park benches are located at points along the trail, each with trash containers. The gazebo is located at the highest point for views.

TWO 20' x30' fitness stations are to be located along the trail. Within the station are towers with three (3) separate exercises features appropriate for all ages.

A final phase of the project will provide for lighting of the trail, and parking lot.

THIS GRANT APPLICATION IS FOR PHASE 1

The Parking Lot and Entrances-PHASE 1:

The plan provides an entry to the Park from both Blue Mound Street and Grayson Street. Pipe Rail entry gates shown will enable the Park to be closed to vehicle traffic at night. 30 standard parking spaces and 2 handicap spaces are provided in Phase 1.

The parking lots are to be gravel base surface without curbs or concrete paving. This will enable construction of a firm surface initially to park vehicles, and provide a stable sub-surface to pave the lots in the future.

After completion of the parking construction, the path of the trail will be mowed enabling use of the earth trail initially. The initial phase will be completed in 2018-19 Rotary year.

Approximately $110,919.00 of the $305,059.00 total project estimated cost is completed and funded to date through community donations.

Use of Grant Funds:

The initial grant application is for construction of the gravel parking lot, entry gates, and mowing of the trail. This $5,770 project cost is possible with the City donating the equipment and labor for parking lot construction plus trail mowing and Rotary paying for the gravel material. The pipe rail fencing material is donated and the labor to install the fence will be done with community & student volunteers.

Progress to Date:

The 22+ acre site has been donated and deeded to the City of Nocona. Additionally, the Gazebo shelter has been constructed at the top of the Blue Mount Hill.

Project Contact Person

District: 5790

Rotary Club of: Nocona

Primary Contact: Kyle Reynolds

Email: kylereynoldsinsurance@windstream.net

Project Status

Dropped
This project has been "Dropped". Check the history log entries to see why it was dropped.

Project listed for the 2019-20 Rotary Year.

Proposed Financing

Existing Contributions Towards This Project

Date

Cash

DDF

Total

Nocona (5790)

21-Aug-18

$2,970

$2,800

$5,770

Total

$2,970

$2,800

$5,770

DDF contributions in grey are pending approval of the corresponding district committee.

Project Supporting Documents


There are no documents yet for this project.
Go to the administration page to upload documents.

Project Photos


There are no photos yet for this project.
Go to the administration page to upload photos.

History Log Entries

21-Aug-18

System Entry

System Entry: Creation of project page.

3-Dec-18

by Robert Herndon

THE PROJECT HAS BEEN PUT ON "HOLD" UNTIL SPRING 2019

21-Jul-19

by Robert Herndon

THIS PROJECT HAS BEEN REPLACED BY P-2976 BLUE MOUND FITNESS PARK, IN THE 2019-2020 DISTRICT FUNDING PERIOD

23-Jul-19

by Dan Steele

System Entry: Project sent for club signatures.

23-Jul-19

by Dan Steele

System Entry: Project signed by Dan Steele.

23-Jul-19

System Entry

System Entry: Project signed by Kylereynoldsinsurance@windstream. Net.

24-Jul-19

System Entry

System Entry: Project signed by Robert Herndon.

24-Jul-19

by Dan Steele

System Entry: Project dropped by Dan Steele.

Reason for dropping: This is a duplicate project of P-2500. Please use the "Edit" function to modify existing projects. Do not create duplicate projects.

© 2010 Philippe Lamoise - Website design by Philippe Lamoise, D2G Online