Facelift of ARASANGUDI GOVERNMENT HR.SEC.SCHOOL
The project includes building of
School Building,
Toilets for Children
Septic Tank, Wash Area and Drinking Water Facility
Findings
There are a total of 4 structures in very bad condition which needs repair and maintenance work
The old building was built in 1952 with a thatched roof is in a demolish stage and the children are not able to use this building due to fear of it coming down on them.
Even the school lacks toilet facility for its boy students and there is no wash facility for them. There are more than 250 boys and girls students from 6th standard to 12th standard studying there. These boys and girls students do not have toilet facility and wash facility
Benefits
It would be of great help to the children studying there and they would study in a good and hygienic atmosphere.
If the school gets a facelift, more students from the villages around it would send there children to study here.
Rough Estimates
1. School Building - 2500 Sq.ft $ 67,857
2. Toilets for Children - 500 sq.ft. $ 13,571
3. Renovation & Maintenance $ 3,572
4. Septic Tank, Wash Area, Drinking Water $ 5,000
Total Project Cost : $90,000
(Calculated at INR 70/- for 1 USD)
|