P-1201

Healthy Schools - Chiquimula

Description

Financing

Documents

Photos

History Logs

Project Description

Country: Guatemala

Location: Chiquimula

Total Budget: $13,700

Areas of Focus: Disease prevention and treatment, Water and sanitation

Activity Type: Water: Sanitation

Summary: Sanitation, medical equipment, clean cook stoves for group of schools


Part 1 - Clean Cook stoves

It is common practice to cook over an open fire or with an improperly vented stove. Using this cooking method increases indoor air pollution which causes a variety of health issues and early mortality. In addition, these cooking methods use over twice the amount of firewood leading to deforestation, high carbon emissions and high fuel costs. This project will add clean cook stoves for 4 schools.

Part 2 - Sanitation

The kinder school in La Catocha has no working bathroom or sink. They currently use a hillside behind the school as their bathroom. This project will install a bathroom and sink for Escuela Rural de Pre- Primaria La Catocha.

Part 3 - Repairs -

The school at El Jurgallón has water leaking in from the back wall causing mold issues in the classrooms. This project will address the wall issue, and update the kitchen in school with clean cook stove and other materials.

Part 4 - Medical Equipment

The local University (CUNORI) runs a low cost medical clinic for the surrounding community. The clinic has very little medical equipment. This project will purchase some of the much needed equipment that the clinic has requested.

Rotarians from the Rotary Club of Fort Collins have visited the project site. We have future follow up trips planned. In addition the local Rotary Club of Chiquimula is actively involved in all aspects of the project. Items in this project were part of a previous Global Grant request. The foundation suggested we address through District Grant instead.

Project Contact Person

District: 5440

Rotary Club of: Fort Collins

Primary Contact: John Trone

Email: john.trone@hotmail.com

Project Status

Completed
This project is "Completed". This means the project has been implemented and the report was accepted by the district leadership. The project will stay listed on this website as a testimony of the achievements of the project partners.

Project listed for the 2016-17 Rotary Year.

Proposed Financing

Existing Contributions Towards This Project

Date

Cash

DDF

Total

Fort Collins (5440)

13-Apr-16

$9,700

$4,000

$13,700

Total

$9,700

$4,000

$13,700

Project Supporting Documents

Project Photos

History Log Entries

13-Apr-16

by Jim Epstein

Welcome message sent.

13-Apr-16

System Entry

Creation of project page.

15-Apr-16

System Entry

Project sent for club signatures.

15-Apr-16

System Entry

Project signed by John Trone.

15-Apr-16

System Entry

Project signed by Glenn Schmidt.

16-Apr-16

System Entry

Project signed by Susan Stewart.

18-Apr-16

System Entry

Project reverted to "Submitted" - Krishna Murthy added to the list of signatories.

18-Apr-16

System Entry

Project signed by Krishna Murthy.

17-May-16

by Jim Epstein

Project received pre-approval.

15-Jun-16

System Entry

Project approved by the District Approval Committee.

28-Jun-16

by Jim Epstein

Report due no later than June 1, 2017

15-Jul-16

by Bill Kehl

System Entry: Check for DDF payment issued by Foundation Treasurer.

19-Jan-17

by John Trone

The retaining wall for the El Jurgallon School is now completed and pictures have been uploaded. Also, the kitchen construction of El Jurgallon School is in progress and pictures have been posted on this site and on Facebook page of Rotarios Chiquimula de la Sierra. https://www.facebook.com/cambioconjunto.crchiquimuladelasierra/media_set?set=a.1181477301969833.1073741870.100003227224368&type=3

13-Jun-17

by John Trone

System Entry: Project has been implemented and final report uploaded.

27-Jul-17

by Randy Looper

System Entry: Final report approved by the District Approval Committee.